Template library

The template library gives you ready-to-use project templates built from the major market standards: PMI (PMBOK®), PRINCE2®, ISO, GAO, AACE International, PM², Stage-Gate®, NASA, RIBA, APQP… Each template is complete: phases, tasks, milestones and dependencies.

Main menu → Settings → Workspace → Template library tab

Nothing is added by default

The library is a catalog you pick from. No template appears in a workspace, or for your users, until an administrator adds it. It is available in every instance, including those created before the library existed.

The tab is reserved for workspace administrators. It acts on the current workspace.

Browse the library​

Each template is shown as a card: publishing organization, summary, domain, approach, and the number of phases, tasks, milestones and working days. Filter by domain or use the search. A card with a green border shows Added and the language the template was loaded in.

Read the sheet and check the WBS​

Click View sheet and WBS. The window gathers everything you need to decide whether the template suits you:

  • Organization and reference of the standard;
  • Who it is for — the target roles;
  • Project types it is designed for;
  • Objectives — what the template helps you achieve;
  • When to use it and its limits — so you do not pick an unsuitable template;
  • Tailoring tips — what is commonly removed, duplicated or renamed.

On the right, the template structure (WBS) shows the full tree as it will be created: WBS number, name, duration in working days, start day (D1 = first day of the project) and predecessors. Click a phase to collapse it; milestones are marked with a diamond. Hover a name to read its description. Each phase has its own colour, shared by all its tasks and milestones: the coloured strip on the left of each row shows it, and it is the colour of the Gantt bars. These colours are fixed: every project created from the template gets exactly the same ones.

Add a template to the workspace​

In the same window:

  1. Template language — choose the language in which phases, tasks and milestones will be created: English (default), French, German, Spanish, Portuguese or Japanese. The WBS preview updates: it shows exactly what will be added.
  2. Profiles with access to the template — check the user groups allowed to create a project from this template. With no group checked, only workspace administrators see it. These accesses are the same as in the Project template access by group tab and can be changed there later.
  3. Click Add to workspace.

The template then joins the workspace templates. Authorized people find it at the Starting point step of the project creation wizard: the start date you enter positions the first task, and the following ones keep their offsets.

A system template: can be duplicated, not modified​

A template added from the library is a system template. It stays faithful to the standard:

  • nobody can modify it — not its definition, its tasks or its members, whatever their role; the server refuses any write;
  • you can duplicate it: the copy is an ordinary template (or project) that you freely adapt to your organization;
  • projects created from it are independent copies, fully editable.

To adapt a standard to your practices, duplicate the system template "as a template", edit the copy, then open that copy to your groups.

Manage or remove an added template​

On an Added card, click Manage to:

  • change the profiles that have access, then Save profiles;
  • Remove from workspace. Projects already created from it are not changed, and the template stays available in the library.

The language of an added template cannot be changed: to get it in another language, remove it and add it again.

Standard or custom templates​

The selector at the top of the screen separates two views of the same library:

  • Standard templates — the catalog of market standards, described above;
  • Custom templates — the project templates created in your workspace. They appear automatically, without being copied or moved: nothing that existed is changed.

Create your own template​

In the Project screen, click New project, then choose A project template. You can start from an empty project, from an existing template (including a standard one) or copy a project. The template then appears under Custom templates. This choice requires the Create project templates right (see User access).

Document a custom template​

Click Document the template. You fill in the same sections as for a standard template: description, who it is for, project types, objectives, when to use it, limits and tailoring tips — one item per line. On the right, the template structure is read from its actual tasks; you also choose the profiles that have access to it.

Only the sheet is saved: the template, its tasks and its members are not changed. A card shows To document until the sheet has been written.

Qualify a template: project type and size​

Each template, standard or custom, can receive two optional attributes:

  • Project type — a free label specific to your organization ("Client project", "Internal project", "Infrastructure"…). Labels already in use are suggested as you type, so they stay identical from one template to another;
  • Project size — small, medium or large by default; the list is specific to your workspace.

By qualifying your templates, you build a decision tree: the wizard first asks for the project type, then for the size, and arrives at the template to use. There is nothing else to configure — the questions and their answers are derived from the types and sizes you have filled in.

These attributes guide the choice of template in the project creation wizard:

SituationWhat the wizard offers
No template has a typeThe list of all templates, with no question
Some templates have a typeThe question "What type of project is it?" with the types in use, then Other templates for those without one
The chosen type has sizesThe question "What size is it?"; templates of that type without a size are under Other templates
The chosen type has no sizeNo question about size
Several templates matchThe list of those templates: the user always chooses

When a single template matches the answers, it is preselected.

Example. Three templates are qualified "Client project" (small, medium, large), one "Internal project" template has no size, and two templates are not qualified. The wizard asks for the type: Client project, Internal project or Other templates. For Client project, it asks for the size and preselects the matching template. For Internal project, it preselects the template directly. For Other templates, it shows the two remaining templates.

Adapting the list of sizes​

The Project sizes button, at the top of the library, opens the list of sizes of the workspace. You can:

  • rename a size ("Large" → "Major project");
  • add sizes ("Programme", "Very small"…), up to twelve;
  • remove a size; the number of templates that carry it is shown on its row, and those templates go back to "no size";
  • reorder the list with the arrows: this is the order in which the wizard offers the answers.

An original size you have not renamed stays displayed in each user's language; a label you type is shown as is to everyone. If you remove all sizes, the wizard no longer asks about size.

Available templates​

Durations are indicative: they give a realistic sequence, to be adjusted to the size of your project.

TemplateOrganizationDomainContentPhases / tasks / milestones
Prosci® 3-Phase Change Management ProcessProsciChange managementStructured change management for the people side of a project, to be run alongside a delivery project.3 / 17 / 3
AACE International – Total Cost Management (capital project)AACE InternationalConstruction and capital projectsCapital-project lifecycle with the AACE estimate classes (5 to 1), project control cycle, and the usual funding gates.7 / 38 / 7
RIBA Plan of Work 2020 – Building projectRoyal Institute of British Architects (RIBA)Construction and capital projectsEight-stage framework for briefing, designing, constructing and handing over a building project.8 / 28 / 8
APM – Body of Knowledge project life cycleAssociation for Project Management (APM)Project managementFive-phase project life cycle from concept to benefits realization, with gate reviews.5 / 23 / 5
GAO – Cost estimate and schedule best practicesU.S. Government Accountability Office (GAO)Project managementThe twelve steps of a reliable cost estimate and the ten best practices of a reliable schedule.6 / 22 / 6
ISO 21500 / 21502 – Project management guidanceInternational Organization for Standardization (ISO)Project managementFive process groups from the ISO project management guidance, with their subject processes.5 / 36 / 5
PM² – European Commission methodologyEuropean CommissionProject managementPM² project life cycle (initiating, planning, executing, closing) with monitoring and controlling across the phases.5 / 25 / 8
PMI – PMBOK® Guide process groupsProject Management Institute (PMI)Project managementFive process groups with their knowledge-area processes and the usual approval gates.10 / 56 / 7
PRINCE2® – Stage-based projectAXELOS / PeopleCertProject managementControlled environment project: management by stages, with the seven PRINCE2 processes.8 / 38 / 6
Agile release – Scrum with sprintsScrum.org / Scrum Guide and PMI Agile Practice GuideProduct and innovationIterative release plan: inception, setup, three two-week sprints, hardening and release. Duplicate the sprint block as needed.8 / 27 / 7
Stage-Gate® – New product developmentRobert G. Cooper / Stage-Gate InternationalProduct and innovationStage-Gate innovation funnel with its five stages and decision gates.7 / 25 / 7
APQP – Advanced Product Quality PlanningAutomotive Industry Action Group (AIAG) / IATF 16949 contextQuality and improvementAutomotive product and process development in five phases, with the APQP quality tools (FMEA, control plan, PPAP).5 / 35 / 5
ISO 13053 – Six Sigma DMAIC improvement projectInternational Organization for Standardization (ISO)Quality and improvementFive-phase DMAIC improvement project with tollgate reviews.5 / 22 / 5
ISO management system certification (9001, 14001, 27001)International Organization for Standardization (ISO)Quality and improvementImplementation of an ISO management system following the common high-level structure, up to the certification audit.7 / 27 / 8
ISO/IEC/IEEE 15288 and 12207 – System and software lifecycleISO / IEC / IEEESystems and engineeringLifecycle stages from concept to retirement, with the technical and technical-management processes of the standards.6 / 28 / 6
NASA – Systems engineering life cycleNASASystems and engineeringFormulation and implementation phases from concept studies to closeout, with the technical reviews and Key Decision Points (KDP).7 / 26 / 19
Trademarks and standards

The templates follow the public structure of these standards to help you plan. They do not replace the official standards or their licensed material. PMBOK is a trademark of the Project Management Institute, PRINCE2 of AXELOS/PeopleCert, Stage-Gate of Stage-Gate International, Prosci and ADKAR of Prosci Inc.