Workload
The Workload screen displays the consolidated workload plan of a team. Each row is a resource; each column, a period (day, week, month, quarter). For each cell, FoxPlan compares the planned (sum of allocations across every project) to the capacity derived from the calendar.
Reached through the Workload menu of a resource portfolio.
Reading cells

| Color | Meaning |
|---|---|
| Green | Workload below capacity — remaining availability |
| Blue | Workload equal to capacity — full speed |
| Orange | Workload near capacity — watch out |
| Red | Overload — the resource is over-allocated |
The displayed figure is, at your choice: man-day count, hour count, or a percentage of capacity.
Filters and options
The toolbar fine-tunes the view:
- Granularity: day, week, month, quarter
- Period: start / end of the displayed horizon
- Include other projects — Show or hide projects outside the team
- Include leave — Subtract declared absences from capacity
- Percentage / man-day mode — Toggle the unit
- Refresh (button at the start of the toolbar, the same on every screen) — Reloads the data, for instance after a planning change made by someone else; changing period, scale, grouping or scenario already reloads the view
Showing project priority
The ⚙️ button opens the View settings. Its Display tab offers two options based on the project's Priority field (levels 1 to 5, set in the project definition).
Priority badge
The Show the project priority as a badge next to its name option adds a colored pill to the right of every project name, in the left-hand column.
| Badge | Priority |
|---|---|
| 🔴 1 | Highest |
| 🟠 2 | High |
| 🟡 3 | Medium |
| 🟢 4 | Low |
| 🟩 5 | Lowest |
Projects with no priority set carry no badge.
Workload breakdown by priority
The Diagram display setting drives what the bars show:
- Workload and overload — the historical behavior described above (a single bar, red background on overload);
- Breakdown by project priority — the bar is split into colored segments, one per priority, each proportional to the workload coming from the projects at that priority.
In this second mode:
- segments stack from the bottom, from priority 1 up to 5, then "no priority" (gray);
- a dashed line marks capacity: anything above it is overload;
- a cell's tooltip details the workload priority by priority, then the total against capacity;
- on a project row, the bar reads as the share of the resource's capacity taken by that project.
That row gathers the projects excluded by the scenario filter, hence potentially several priorities: no single color would represent it faithfully. It keeps the usual workload / overload display, and its workload counts as "no priority" at the resource level. The orange badge on the Scenario button reminds you how many projects are excluded this way.
Both options are per user, remembered for this portfolio, and only take effect when the panel is confirmed.
Cell display options
The Display tab of the View settings (⚙️ button) also holds three checkboxes, applied on validation:
- Show week numbers — column headers show the week number instead of the day;
- Show total capacities — each cell shows "load / capacity"; unchecked, the load only;
- Show totals as percentages — the load expressed as a percentage of capacity.
The download button sits in the toolbar, just left of favorites. It offers the PNG, PDF, Excel and Workload export (.pptx) exports.
Workload export (.pptx) builds a PowerPoint presentation of the resource grid, as editable native tables: one row per resource, one column per period of the displayed scale, plus the total. Each cell mirrors the on-screen display — "workload/capacity", workload only or percentage, depending on the cell display options — on a red background when overloaded (planned > capacity) and blue when the planned workload fits within capacity; a legend explains the colours. Beyond 20 resources or 12 periods, the table continues on further slides. The figures are the same as in the Excel export.