Actuals

The Actuals screen shows the detail of the time actually spent by a team of resources, sourced from timesheets. Each row is an actual broken down by resource, task, project and date, enriched with its budget and valuation information.

Data is displayed in a grid with configurable columns, over the period of your choice.

Reached through the Actuals menu of a resource portfolio.

Toolbar

  • From / To — the two date pickers define the analyzed period.
  • Current month — refocuses the period on the running month.
  • Current year — switches the period to the running year.
  • More (dropdown menu) — exports the view to PNG or Excel.
  • Column configuration (gear icon) — opens the column manager to choose and order the displayed columns.
  • Favorites — saves the view (columns, filters and period) to recall it in one click.

Available columns

Columns are chosen in the column manager. The main ones:

ColumnContent
Actual dateDate on which the time was spent
ResourceResource who entered the time
TaskTask the time is charged to
ProjectParent project
Actual (man-days)Time spent on the row
Resource cost / Cost valuationCost of the time spent and its valuation
Resource revenue / Revenue valuationAssociated revenue and its valuation
Actual typeNature of the actual (filterable via the header icon)
StatusTask status
CommentEntry comment
Budget attributesBudget, Code, Sub-code, Heading, Type, Third-party code, Third-party label, Budget link, Innovation

Columns with a filter (e.g. Actual type) show an icon in their header to narrow the display.

Typical uses

Project closeout

At closure, summing the man-days actually consumed per project or per resource is the basis for the retrospective and the calibration of future projects.

Valuation follow-up

The cost and revenue columns (and their valuations) let you track the financial consumption of time spent, based on the budget's daily rates.

Reporting

The view can be exported to PNG (grid capture) or Excel to feed dashboards.

See also

  • Workload — planned view
  • Timesheet — source entries of the actuals
  • Budget — daily rates applied for valuation
Data consistency

Actuals come from timesheets. Validate timesheets regularly to keep the view up to date.